Planning Your Kitchen Renovation Timeline

One of the most common questions we hear is "How long will my kitchen renovation take?" While every project is unique, here's a realistic timeline for a typical GTA kitchen renovation.

Before Construction Begins (4-8 weeks)

Weeks 1-2: Design and Planning

  • Initial consultation and measurements
  • Design development and revisions
  • Material selection begins

Weeks 3-4: Finalizing Details

  • Cabinet orders placed (6-8 week lead time for custom)
  • Countertop templating scheduled
  • Appliances ordered
  • Permits applied for (if needed)

Weeks 5-8: Waiting Period

  • Cabinets being manufactured
  • Finalizing material selections
  • Preparing your temporary kitchen setup

Construction Phase (3-5 weeks)

Week 1: Demolition and Rough-In

  • Day 1-2: Existing kitchen demolished
  • Day 3-4: Electrical rough-in
  • Day 5: Plumbing rough-in
  • Inspection scheduled

Week 2: Structural and Prep

  • Any structural modifications completed
  • Drywall repairs and installation
  • Subfloor preparation
  • Inspection completed

Week 3: Cabinets and Major Installations

  • Base cabinets installed
  • Wall cabinets installed
  • Countertop template taken
  • Appliance rough-in completed

Week 4: Finishing Work

  • Countertops installed
  • Backsplash tile work
  • Plumbing fixtures connected
  • Electrical fixtures installed

Week 5: Final Details

  • Cabinet hardware installed
  • Appliances connected
  • Touch-up painting
  • Final cleaning
  • Walk-through and punch list

Tips for Surviving Your Kitchen Renovation

Set Up a Temporary Kitchen

  • Move your microwave, toaster, and coffee maker to another room
  • Set up a utility sink if possible
  • Stock up on disposable plates and utensils
  • Plan for more takeout and simple meals

Protect Your Home

  • We use plastic barriers to contain dust
  • Cover furniture and floors in adjacent rooms
  • Establish a clear path for workers

Communication is Key

  • We provide daily updates on progress
  • Weekly meetings to address any decisions needed
  • Clear timeline with milestone markers

Factors That Can Affect Timeline

  • Custom vs. stock cabinets
  • Permit requirements
  • Structural changes
  • Supply chain delays
  • Weather (for exterior work)
  • Change orders

Ready to Start Planning?

Contact PReno for a detailed consultation. We'll assess your specific project and provide a realistic timeline based on your goals and selections.

Ready to Start Your Renovation?

Get a free quote from PReno Construction and bring your vision to life with our expert team

Share this article:

Continue Reading

More articles you might find helpful

Open Concept Living: Is It Right for Your GTA Home?
Renovation TipsInterior Design
Open Concept Living: Is It Right for Your GTA Home?
Discover the pros and cons of open concept floor plans and whether this popular renovation trend suits your Toronto area home and lifestyle.
PReno Team
5/17/2026
Bathroom Ventilation: The Most Overlooked Renovation Detail
BathroomVentilation
Bathroom Ventilation: The Most Overlooked Renovation Detail
Why proper bathroom ventilation is essential and how to ensure your renovation includes adequate exhaust systems.
PReno Team
5/4/2026