Skip to main content

Toronto & GTA renovation service

Bathroom Renovation in Toronto & GTA

Modernize your bathroom with full renovation service — waterproofing, tile, vanities, and more.

Toronto & GTA service areaScope reviewed before next steps
Bathroom Renovation in Toronto & GTA project by PReno Construction

Start with the scope

Send the project postal code, timing and optional photos. PReno will review the details before discussing the next estimate step.

01

Waterproofing

Professional waterproofing and drywalling

02

Tile Installation

Floor, wall, and shower tile installation

03

Complete Service

Vanity, plumbing, fixtures, painting, and trim work

What to expect

A Practical Approach to Bathroom Renovation in Toronto & GTA

Modernize your bathroom with PReno's full renovation service — from waterproofing to tile installation and vanities.

  • Demolition and disposal
  • Waterproofing and drywalling
  • Tile installation (floor, wall, shower)
  • Vanity and mirror installation
  • Plumbing and fixtures
  • Painting and trim work

We serve Toronto, Mississauga, Etobicoke, North York, Scarborough, Vaughan, Oakville, and Brampton. Typical bathrooms: 7–14 days.

Project flow

Our Process

A clear sequence from the initial estimate through site preparation, installation and cleanup.

  1. 1

    Demolition and Disposal

    Remove old fixtures and materials

  2. 2

    Waterproofing and Drywalling

    Install waterproof membrane and drywall

  3. 3

    Tile Installation

    Install floor, wall, and shower tile

  4. 4

    Vanity and Mirror Installation

    Install vanity, mirror, and accessories

  5. 5

    Plumbing and Fixtures

    Install plumbing fixtures and connections

  6. 6

    Painting and Trim Work

    Final painting and trim installation

Helpful answers

Frequently Asked Questions

Common questions about bathroom renovation in toronto & gta in Toronto and the GTA.

Do you help with design and layout?

Yes — we guide you with modern styles and durable materials.

Can you work in condos?

Absolutely, we handle condo building rules and scheduling.

How long does it take?

Typical bathrooms take 7–14 days depending on scope.

Service area

Areas We Serve

Contact PReno with your postal code to confirm current availability for your project.

TorontoMississaugaEtobicokeNorth YorkScarboroughVaughanOakvilleBrampton

Free estimate request

Ready to Discuss Your Project?

Share the location, timing and project details. Photos are optional and can help clarify the existing condition.